Coca-Cola Marseille

Electrical and mechanical dismantling of a complete canning line. The individual machines and system components were removed and loaded. Both the dismantling and the demanding logistics were carried out in shifts due to time constraints.

Read more

Feldschlösschen AG Dresden

Implementation of a complete high-performance palletizing system. Reconnection to the line. For space reasons, it was necessary to implement this. The challenge lay in the fact that only 10 days of production were specified. 50m of used crate transport was also supplied by Drink Getränkemaschinen GmbH. Here too, the line went into operation on schedule.

Read more

Zum Shop